Thornton’s Waste Recycling – Re Build Design & Installation
In March 2021 Turmec were awarded the contract to deliver a plant with a throughput rate of 100 tph comprising of 60tph C&D (Construction & Demolition Waste) and 40tph MSW (Municipal Solid Waste)
more >Hills Group – MDR Plant
Turmec designed, supply and installed an advanced MRF plant for The Hills Group, which treats kerbside and processes 20 tonnes of MDR per hour.
more >Patons Lane RRC Hybrid Dry & Wet Plant
Turmec designed and built the first hybrid dry and wet recycling plant in the world so Bingo Patons Lane RRC could process fines at the capacity needed, making sure all the fines were clean and clear of impurities, ready to go straight to the end-user immediately, cutting down on reprocessing costs and traffic movements.
more >EfW – Incinerator bottom ash plant
Creating an efficient system for the collection and transportation of ash underneath the bottom incinerator as well as the treatment plant that ash would then pass through.
more >ETM’s Custom Fit Recycling Plant
Turmec's plant allowed ETM Recycling to expand their business, doubling the amount of waste they process and helping ETM to achieve 98% landfill diversion.
more >Bord Na Mona Edenderry Power
Turmec designed and delivered a biomass handling system for Bord Na Mona Edenderry Power Station that receives up to 700m3 of material at any one time.
more >Biffa – Fiber Optical Upgrade
Turmec installed 5 Optical separators to both decrease manual picking and increase paper purity, so the recovered paper would only pass through a picking station for quality control, before baling.
more >Central Waste Station in NSW, Australia
Plant responsible for recycling C&D and C&I waste in the Hunter Region, NSW Australia, serving Newcastle, Maitland, Cessnock, Singleton, Port Stephens and the Central Coast.
more >Powerday – Main Facility Upgrade
Upgrade to plant to further process fines, improving layout and efficiency to fit in space available. Completed in 10 weeks, no downtime, with plant operational throughout.
more >Pinden RDF Refinement Line
Turmec introduced a secondary industrial shredder to reduce the 400mm RDF to the desired size of sub 100mm, as well as over band magnets that would recover any remaining ferrous fraction and a screening process to further refine the RDF before its baled and exported.
more >Pinden – C&D / C&I Plant
Turmec proposed a nearly fully automated system, quality controlling the recovered materials which would be automatically segregated from the waste, using state-of-art machinery.
more >Derwen’s Bespoke Optical Upgrade
With Turmec's upgrade design, Derwen Optical doubled the recovery rates of recyclets, reduced manual picking and now has a 98% landfill diversion rate.
more >ResourceCo – Alternate Fuels from Waste
Design and manufacture a 65 tonnes p.h. processing plant that creates PEF Processed engineered fuel (SRF) from C&D and C&I waste, separating the waste into clean segregated fractions.
more >AES Tyre Recycling Plant’s Design and Built
Plant for recycling of rubber tyres, recycling more than 30,000 tonnes of tyres every year – The equivalent of over 3.5 million tyres
more >Powerday – C&D Plant Upgrade
Powerday Building 1 – Industrial Shredder/ Baler & Wrapper and secondary shredder. Eliminating double handling and providing backup.
more >Derwen C&D / C&I Recycling Plant